Print queue planner

List the jobs you want to run, how long a plate swap takes and how many clean plates you will load at a time. The planner lays out the queue plate by plate, adds up the time and marks when the loaded plates run out. It uses only the numbers you type in, runs in your browser and sends nothing anywhere.

Jobs in the queue

One copy is one plate. Use the print time your slicer gives for one plate. Times are worked to the second.

Your changer

Your timeline

Fill in at least one job, the swap time and your plates, then choose “Lay out the queue”. The timeline appears here.

How the estimate works

time for one plate = print time + swap time
total time = Σ (print time + swap time), over every plate
a load = up to (usable plates per load) plates in a row;
loads needed = plates in the queue ÷ usable plates per load, rounded up
reloads = loads needed − 1

Every result is an estimate. Selection codes follow the jukebox pattern: the letter is the job and the number is the copy, so A3 is the third plate of job A.

Unit conversions use 60 minutes per hour, 60 seconds per minute and 24 hours per day (1,440 minutes), as listed in NIST Special Publication 330, section 4, table 8 (National Institute of Standards and Technology).

Assumptions

Planner limits and precision

These are limits of this planner, not facts about any changer:

Background reading

Queue tools can stop by themselves once the loaded plates are used. These two vendor pages cover different things: one shows a cycle limit you can configure, and the other covers plate loading and loop setup for one specific changer model.

Our guide to SimplyPrint AutoSwap setup covers matching the cycle limit to the plates you load.