Print queue planner
List the jobs you want to run, how long a plate swap takes and how many clean plates you will load at a time. The planner lays out the queue plate by plate, adds up the time and marks when the loaded plates run out. It uses only the numbers you type in, runs in your browser and sends nothing anywhere.
Your timeline
Fill in at least one job, the swap time and your plates, then choose “Lay out the queue”. The timeline appears here.
How the estimate works
total time = Σ (print time + swap time), over every plate
a load = up to (usable plates per load) plates in a row;
loads needed = plates in the queue ÷ usable plates per load, rounded up
reloads = loads needed − 1
Every result is an estimate. Selection codes follow the jukebox pattern: the letter is the job and the number is the copy, so A3 is the third plate of job A.
Unit conversions use 60 minutes per hour, 60 seconds per minute and 24 hours per day (1,440 minutes), as listed in NIST Special Publication 330, section 4, table 8 (National Institute of Standards and Technology).
Assumptions
- One copy is one plate. Each plate is printed, then swapped off the bed.
- The swap time is counted after every plate, including the last one, because the changer still has to clear it.
- “Usable plates per load” is the number of clean, compatible plates you actually load, or plan to load, each time. It includes the plate already on the bed and must be within what your changer can hold. Owning more plates than it holds does not lengthen the unattended window, so enter the number it takes at a time.
- After one load the queue waits for you to clear and reload. The next load then runs the following plates in order. The last load can have fewer plates than the others.
- Elapsed times leave out reload downtime, cleaning and any time you take between loads. Add them yourself.
- Jobs run in the order listed, with no failed prints, pauses, heat-up beyond what is in your print time, or filament changes.
- Print times are the ones you enter, usually your slicer’s estimate. Real prints can run longer or shorter.
- The optional start time is a 24-hour clock time. Later times are shown as “day 2”, “day 3” and so on, using fixed 24-hour days with no time zone or daylight saving change.
Planner limits and precision
These are limits of this planner, not facts about any changer:
- Up to 10 jobs, 500 copies per job and 1,000 plates in one queue.
- Up to 240 hours (and 59 minutes) of print time per plate, up to 240 minutes of swap time, and up to 200 usable plates per load.
- Inputs are rounded to whole seconds, and a value that would round to zero seconds is refused. Totals under one hour are shown in minutes and seconds. Longer times are rounded to the nearest minute, and clock times to the nearest minute.
- Numbers can use a decimal point (1.5), a decimal comma with one or two digits (1,5) or grouped thousands (1,000). Other commas are refused rather than guessed.
Background reading
Queue tools can stop by themselves once the loaded plates are used. These two vendor pages cover different things: one shows a cycle limit you can configure, and the other covers plate loading and loop setup for one specific changer model.
- AutoPrint stopped after a number of prints (max cycles reached), SimplyPrint Helpdesk: a configurable cycle limit that pauses starting and clearing prints until it is reset.
- PlateCycler C1 Installation Guide for Bambu Lab A1, Chitu Systems: model-specific plate loading and loop setup.